| |
CDM 546 Draft DOPAA
- Description:
- PM/ Contact: Erica
Admin. - David
*To Admin: 12/08/2011
Date Due: 12/13/11
Bill to: 546-02
*Sent to Client via (email) on 12/09/2011
Notes:
1. Draft DOPAA Multiple/parceled documents. Do not format as document will be formatted by client. “Date of Delivery” is tentative until confirmed by client. MGJ requests review of documents prior to submittal to client.
2. \\Tera1\tc\Clients\CDM\546 - EA-EBS T Ramp\Reports\R1 - DOPAA
Also, please review the HASP located at the this directory:
\\Tera1\tc\Clients\CDM\546 - EA-EBS T Ramp\Reports\R1 - DOPAA\HASP
ACF Environmental 578 R1
- Description:
- PM/ Contact: Dan
Admin. - David
To Admin: 12/xx/201
CLIENT NAME/NUMBER: ACF Environmental
PROJECT NAME: PA Turnpike I-476 Bridge Replacements
PROJECT NUMBER: 578
DELIVERY OPTIONS: Electronic
Preferred DATE OF DELIVERY: 12/9/11
Required DATE OF DELIVERY: 12/9/11
BILL TO: 578-01
project number. 01 Task 1 design of retaining walls
NOTES: Electronic PDFs of Design Calculations and Construction Drawings
Client Address: ACF Environmental Pittsburgh, PA
Client Contact Name: Mr. Greg Kramer gkramer@acfenvironmental.com
Project Scope: Design of 7 sets of temporary retaining walls for bridge replacements using synteen geogrids
Secondary Client: Synteen Geotechnical Fabrics
Secondary Client Address
Synteen Technical Fabrics, Inc.
112 Washington Place
State College, PA 16801
(719)243-7940 (p)
(412)564-9901 (f)
jon@synteen.com
www.synteen.com
Secondary Client Contact Name: : Jon Nirnberger
Northeast Regional Manager
1409 383-05 Site 10 RD RAWP Final
- Description:
- PM/ Contact: Erica
Admin. - David
*To Admin:12/05/2011
*To QM: 12/6/2011
*Sent to Client via (fedex) on 12/12/2011
Notes:
1. Electronic and Hard Copy
2. Postponed on 11/22 to 11/29
3. Moved on 11/28 to 12/2
4. (ED)- It will be several hard copies and many CDs (of two different versions) and two different cover letters. I will get the cover letters done (Friday) so if Rose wants to start copying, she can.
5. EPA approved final changes update final pdf.
6. final pdf updated 12/5 - exception, need figure 7. Figure added 12/6 going to QC
8. Post QC changes from Erica 12/7/11
9. Final round of changes completed 12/8/11
[All day event] Toby (PIT) @ NC
- Description:
- Field Work
|
| 8:00am |
|
| 8:10am |
|
| 8:20am |
|
| 8:30am |
|
| 8:40am |
|
| 8:50am |
|
| 9:00am |
|
| 9:10am |
|
| 9:20am |
|
| 9:30am |
|
| 9:40am |
|
| 9:50am |
|
| 10:00am |
|
| 10:10am |
|
| 10:20am |
|
| 10:30am |
|
| 10:40am |
|
| 10:50am |
|
| 11:00am |
|
| 11:10am |
|
| 11:20am |
|
| 11:30am |
|
| 11:40am |
|
| 11:50am |
|
| 12:00pm |
|
| 12:10pm |
|
| 12:20pm |
|
| 12:30pm |
|
| 12:40pm |
|
| 12:50pm |
|
| 1:00pm |
|
| 1:10pm |
|
| 1:20pm |
|
| 1:30pm |
|
| 1:40pm |
|
| 1:50pm |
|
| 2:00pm |
|
| 2:10pm |
|
| 2:20pm |
|
| 2:30pm |
|
| 2:40pm |
|
| 2:50pm |
|
| 3:00pm |
|
| 3:10pm |
|
| 3:20pm |
|
| 3:30pm |
|
| 3:40pm |
|
| 3:50pm |
|
| 4:00pm |
|
| 4:10pm |
|
| 4:20pm |
|
| 4:30pm |
|
| 4:40pm |
|
| 4:50pm |
|
| 5:00pm |
|