| |
PENNDOT - On-Site Supervisor
- Description:
- CLIENT NAME/NUMBER: PENNDOT
PROJECT NAME: On-Site Supervisor Level II Status
PROJECT NUMBER: N/A
PM/CONTACT PERSON: Rich Schutte
DELIVERY OPTIONS: Overnight 1/24/12 completed
Preferred DATE OF DELIVERY: 1/06/12
Required DATE OF DELIVERY: 1/24/12
BILL TO: Rhea Professional Certification
NOTES:
Client Address:
Pennsylvania Department of Transportation
Bureau of Construction Materials
DGS Annex Complex
81 Lab Lane
Harrisburg, PA 17110-2543
Client Contact Name: Mr. Kerry Petrasic, P.E., Chief Geotechnical Engineer
Project Scope: Letter submitting application for Pennsylvania Department of Transportation Drilling On-Site Supervisor/Inspector Level II Status for Mr. Richard W. Schutte, PG based on existing experience.
Secondary Client: NA
Secondary Client Address:
Secondary Client Contact Name:
1.(Notes regarding production process entered by Admin.)
2.
3.
4.
USACE PIT 466 Sheraden Park NPDES
- Description:
- PM/ Contact: Kevin
Admin. - David + Rose
Part of Sheraden Park 100% already completed
Delivered: Electronic ONLY
Notes:
1. Appendix G Only
2. Alcosan signature still needed
3.
3237 524-POL OM2 R1 4015 AMR Final
- Description:
- TITLE: 3237 524-POL OM2 R1 4015 AMR Final
PM/ CONTACT: Ben
CHARGE TIME TO: 524-02
ADMIN.: David
TO ADMIN: 01/11/12
PREFERRED DELIVERY DATE: 01/16/12
REQUIRED DELIVERY DATE: 01/17/12
DELIVERED: (01/17/12)
DELIVERY MODE: (FedEx sent 01/16/12)
DELIVERY VERIFICATION: Tracking # 7931-2105-9937
CLIENT CONTACT NAME:
CLIENT ADDRESS:
PM/ CONTACT NOTES:
1. 2 hardcopy/ CD + Rhea copies confirmed 1/16/12.
2.
ADMIN PRODUCTION NOTES
1. To QC 01/13/12
2.
[All day event] BT- Rose (PIT)
- Description:
- Benefit Time
[All day event] Dan (PIT) @ PA TPike (Phila.)
- Description:
- TRIP TYPE: Jobsite Meeting
CHARGE TIME TO: 578-01 (ACF)
PARTICIPANTS: Dan Messmer (PIT)
DEPARTURE: late p.m. 1/15/12
LOCATION: NE Extension North of Mainline
ITINERARY: Meeting 1/16/11 @ 10:00 a.m.
RETURN: After Meeting Return Drive
Notes:
1. Integration of Rhea MSE design with adjacent construction- add'l scope expansion/ design.
[All day event] Toby (PIT) @ NC
- Description:
- Field Work
|
| 8:00am |
|
| 8:10am |
|
| 8:20am |
|
| 8:30am |
|
| 8:40am |
|
| 8:50am |
|
| 9:00am |
|
| 9:10am |
|
| 9:20am |
|
| 9:30am |
|
| 9:40am |
|
| 9:50am |
|
| 10:00am |
[10:00am] Manpower Staffing Mtg
- Description:
- Manpower Staffing Meeting
*This meeting will now be held every 2 weeks or as scheduled.
Go to t:\admin\staffing resources\ and keep:
1. Manhours current
2. Holiday/ Vacation Time (self + reporting employees)
3. BD Time
|
| 10:10am |
| 10:20am |
| 10:30am |
| 10:40am |
| 10:50am |
| 11:00am |
| 11:10am |
| 11:20am |
| 11:30am |
| 11:40am |
| 11:50am |
| 12:00pm |
|
| 12:10pm |
|
| 12:20pm |
|
| 12:30pm |
|
| 12:40pm |
|
| 12:50pm |
|
| 1:00pm |
|
| 1:10pm |
|
| 1:20pm |
|
| 1:30pm |
|
| 1:40pm |
|
| 1:50pm |
|
| 2:00pm |
|
| 2:10pm |
|
| 2:20pm |
|
| 2:30pm |
|
| 2:40pm |
|
| 2:50pm |
|
| 3:00pm |
|
| 3:10pm |
|
| 3:20pm |
|
| 3:30pm |
|
| 3:40pm |
|
| 3:50pm |
|
| 4:00pm |
|
| 4:10pm |
|
| 4:20pm |
|
| 4:30pm |
|
| 4:40pm |
|
| 4:50pm |
|
| 5:00pm |
|