Rhea Engineers & Consultants Corporate Calendar
Login 
Wednesday, April 11, 2012
Public Access


Category:
Category: All

11
April 2012
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          
  3237 520-04 R12 TM
Description:
TITLE: NAVFAC 3237-520 TM PM/ CONTACT: Scott (NC) CHARGE TIME TO: 520-04 ADMIN.: David, Rose TO ADMIN: 4/11/12 PREFERRED DELIVERY DATE: 4/11/12 REQUIRED DELIVERY DATE: 4/11/12 DELIVERED: 04/12/12 DELIVERY MODE: Email DELIVERY VERIFICATION: CLIENT CONTACT NAME: NAVFAC - Cleland; MCB - Charity CLIENT ADDRESS: PM/ CONTACT NOTES: 1. Can go out on 4/12/12 2. ADMIN PRODUCTION NOTES 1. reviewed/edited sent back to Scott 4/11 2.

615- Proposal
Description:
TITLE: Pittsburgh Parks Conservancy-615 PM/ CONTACT: KMB, ZW CHARGE TIME TO: 615-00 ADMIN.: David, Rose TO ADMIN: 4/11/2012 PREFERRED DELIVERY DATE: 4/12/2012, noon REQUIRED DELIVERY DATE: 4/12/2012, noon DELIVERED: 04/12/12 DELIVERY MODE: hand delivery DELIVERY VERIFICATION: Tracking # xxxxxxxxxxxx CLIENT CONTACT NAME: Marijke Hecht CLIENT ADDRESS: 2000 Technology Drive, Suite 300 Pittsburgh, PA 15219 PM/ CONTACT NOTES: 1. We are prime, Skelly and Loy and HF Lenz will be subcontractors. 2.The proposal will be a letter format, stapled. The proposal should be printed double sided on post-consumer recycled content paper. One hard copy to be sent to the client. ADMIN PRODUCTION NOTES: 1. 2.

0492/531/R13/MCB2 Methane Report
Description:
TITLE: MCB2 Methane Report PM/ CONTACT: Brad/Marcy CHARGE TIME TO: 53102 ADMIN.: David, Rose TO ADMIN: 4/9/12 PREFERRED DELIVERY DATE: 4/11/12 REQUIRED DELIVERY DATE: 4/13/12 DELIVERED: Sent 04/11/12 DELIVERY MODE: Fedex DELIVERY VERIFICATION: Tracking # 7934-4196-5980 CLIENT CONTACT NAME: Fred Evans CLIENT ADDRESS: PM/ CONTACT NOTES: 1. 3 hard copies, clipped, no CDs 2. ADMIN PRODUCTION NOTES 1. Reviewed and edited 4/11 2.

546 - Field Work Sara (PIT)
Description:
TRIP TYPE: Soil borings and enviornmental exploration CHARGE TIME TO: 54601 - 911th Air Reserve PARTICIPANTS: Sara (Jason + Zach backups) TRANSPORTATION: Personal Cars DEPARTURE: 03/12/2012 ITINERARY: Environmental Sampling RETURN: 05/11/2012 Notes: 1. Jason + Zach to fill-in as required. 2. Last day in field 5/2/12 w/ surveyors 3.

573 - Field Work Matt (PIT)
Description:
TRIP TYPE: MicroPile Inspection @ Conemaugh Power Station for Hayward Baker, Inc. CHARGE TIME TO: 573-01 PARTICIPANTS: Matt TRANSPORTATION: Holiday Inn Johnstown + Rental Car DEPARTURE: 03/26/2012 ITINERARY: Environmental Sampling RETURN: 4-13-12 (Phase 1) Notes: 1. Dan, Sara + Jason- backup personnel. 2. 3.

VA Office BD- Tim (NC)
Description:
TRIP TYPE: BD + Various Billable CHARGE TIME TO: 90661-Meals, 90662 Travel, Job # ADMIN. SUPPORT: Pending PARTICIPANTS: Tim (NC) TRANSPORTATION: Pending + Holiday Inn Express (Pre-negotiated/ billed rates) DEPARTURE: 4/9/12 early a.m.pending LOCATION: Woodbridge, VA ITINERARY: @ office 4/9/12 thru 4/12/12 RETURN: 4/12/12 late p.m. RHEA MARKETING TARGETS: • GEOTECHNICAL: moderate • ENVIRONMENTAL: moderate • FIELD MONITOR//MGMT: moderate • CIVIL SITE DEV.: moderate • WATER/ WASTEWATER moderate NOTES: 1. Pending 2. 3.

VA Office BD- Kevin (PIT)
Description:
TRIP TYPE: BD + Various Billable CHARGE TIME TO: 90661-Meals, 90662 Travel, Job # ADMIN. SUPPORT: Pending PARTICIPANTS: Kevin (PIT) TRANSPORTATION: Pending + Holiday Inn Express (Pre-negotiated/ billed rates) DEPARTURE: 4/11/12 late LOCATION: Woodbridge, VA ITINERARY: @ office 4/12/12 thru 4/13/12 RETURN: 4/13/12 late p.m. RHEA MARKETING TARGETS: • GEOTECHNICAL: moderate • ENVIRONMENTAL: moderate • FIELD MONITOR//MGMT: moderate • CIVIL SITE DEV.: moderate • WATER/ WASTEWATER moderate NOTES: 1. Pending 2. 3.

[All day event] BT- Dan (PIT)
Description:
Unscheduled

8:00am  
8:10am  
8:20am  
8:30am  
8:40am  
8:50am  
9:00am  
9:10am  
9:20am  
9:30am  
9:40am  
9:50am  
10:00am  
10:10am  
10:20am  
10:30am  
10:40am  
10:50am  
11:00am  
11:10am  
11:20am  
11:30am  
11:40am  
11:50am  
12:00pm  
12:10pm  
12:20pm  
12:30pm  
12:40pm  
12:50pm  
1:00pm  
1:10pm  
1:20pm  
1:30pm  
1:40pm  
1:50pm  
2:00pm  
2:10pm  
2:20pm  
2:30pm  
2:40pm  
2:50pm  
3:00pm  
3:10pm  
3:20pm  
3:30pm  
3:40pm  
3:50pm  
4:00pm  
4:10pm  
4:20pm  
4:30pm  
4:40pm  
4:50pm  
5:00pm  
www.rhea.us