Rhea Engineers & Consultants Corporate Calendar
Login 
Monday, June 18, 2012
Public Access


Category:
Category: All

18
June 2012
Sun Mon Tue Wed Thu Fri Sat
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
  DCP/Marysville/R4 54902 Specifications
Description:
TITLE: Marysville/54902/Draft Specifications PM/ CONTACT: KMB CHARGE TIME TO: 54902 ADMIN.: David, Rose TO ADMIN: specs 06/11/12 E&S 6/11/12 PREFERRED DELIVERY DATE: 6/11/2012 (not firm) REQUIRED DELIVERY DATE: 6/19/2012 DELIVERED: 06/22/12 DELIVERY MODE: Email DELIVERY VERIFICATION: Tracking # xxxxxxxxxxxx CLIENT CONTACT NAME:Joe DeWitt CLIENT ADDRESS: PM/ CONTACT NOTES: 1. Appendix A - E&S Included as well 2. Appendix B - Boring Logs 3. Appendix C - Construction Drawings ADMIN PRODUCTION NOTES 1. E&S reviewed and returned 06/15/12 2. Report went to QC on 6/22/2012

3214/454/R6 - JP5 Incident LSA - Final
Description:
TITLE: LSA Report NAVFAC R6 - Final PM/ CONTACT: Scott/Ken CHARGE TIME TO: 454-03 ADMIN.: Carole/David TO ADMIN: 06/15/12 pm PREFERRED DELIVERY DATE: 6/20/12 REQUIRED DELIVERY DATE: 6/20/12 DELIVERED: Shipped to NC on 6/19/12 for delivery on 6/20/19 DELIVERY MODE: FedEx / PDF DELIVERY VERIFICATION: Tracking # 798544457240 CLIENT CONTACT NAME: Jose Parra CLIENT ADDRESS: See letter PM/ CONTACT NOTES: 1. Two hardcopies/CDs to EMD (Jenni Reed) 2. One hardcopy/CD to NAVFAC (Jose Parra) 3. PDF version for Ken to load to POL database 4. Send all hardcopies to NC for stamp and signature. We will hand deliver. ADMIN PRODUCTION NOTES 1. to QC 06/18/12 2. shipped to NC for signing/hand delivery 06/18/12 3. NAVFAC copy to be shipped Wed.

0492/531 Quantico Field Work - Brad, Zach, & Ben
Description:
TRIP TYPE: Field Work CHARGE TIME TO: 53101 - RRL, 53102 - MCB-2 PARTICIPANTS: Brad/Zach/Ben + 1 (GAI- PIT office) TRANSPORTATION: Rentals DEPARTURE: 6/17/12 LOCATION: Quantico, VA ITINERARY: Field Work RETURN: 6/22/12 NOTES: 1. 2. 3.

573 - Field Work- Sara (PIT)
Description:
TRIP TYPE: MicroPile Inspection @ Conemaugh Power Station for Hayward Baker, Inc. CHARGE TIME TO: 573-01 PARTICIPANTS: Sara TRANSPORTATION: Holiday Inn Johnstown + Rental Car DEPARTURE: 5/11/2012 ITINERARY: Environmental Sampling (Phase II) RETURN: 6/15/12 (Estimate) Notes: 1. Dan and Matt Backup (possibly Jason too). 2. Sara full time. Matt @ office 5/16/12. 3.

VA Office Marketing (PWCSA)
Description:
TITLE: VA Office Marketing (PWCSA) PM/ CONTACT: Jeff,Dan CHARGE TIME TO: VA Marketing ADMIN.: Rose TO ADMIN: 6/15/12 PREFERRED DELIVERY DATE: 6/19/12 Midday REQUIRED DELIVERY DATE: prior to M.O.D. Luncheon DELIVERED: 06/19/12 DELIVERY MODE: take manually DELIVERY VERIFICATION: n/a PM/ CONTACT NOTES: 1. Need 5 copy of general press kits, w/ some geotechnical and environmental updates. 2. Add the Water Resources Projects taken from the website. ADMIN PRODUCTION NOTES 1. 2.

[All day event] BT- Kevin (PIT)
Description:
Benefit Time

8:00am  
8:10am  
8:20am  
8:30am  
8:40am  
8:50am  
9:00am  
9:10am  
9:20am  
9:30am  
9:40am  
9:50am  
10:00am  
10:10am  
10:20am  
10:30am  
10:40am  
10:50am  
11:00am  
11:10am  
11:20am  
11:30am  
11:40am  
11:50am  
12:00pm  
12:10pm  
12:20pm  
12:30pm  
12:40pm  
12:50pm  
1:00pm  
1:10pm  
1:20pm  
1:30pm  
1:40pm  
1:50pm  
2:00pm  
2:10pm  
2:20pm  
2:30pm  
2:40pm  
2:50pm  
3:00pm  
3:10pm  
3:20pm  
3:30pm  
3:40pm  
3:50pm  
4:00pm  
4:10pm  
4:20pm  
4:30pm  
4:40pm  
4:50pm  
5:00pm  
www.rhea.us