|
AMS-Rhea JV/2292/1041/R9/Final Mechanicsburg AMR - Site 3
- Description:
- TITLE: AMS-Rhea JV/2292/1041/R9/Final Mechanicsburg AMR - Site 3
CONTACT: Brad
CHARGE TIME TO: 1041.13
DUE: Jan 2021, date flexible
REPORT PREPARED BY: Mike/Brad
QA/ QC REVIEW BY: none, only changes to cover and footers - no technical changes
DELIVERED:
> METHOD: Email
Notes:
1. Electronic Only Deliverable - Brad uploaded to DoD safe on Jan 8, 2021
2.
3.
4.
2266 - Draft JBAB Slug Control Plan
- Description:
- TITLE: AMS/0309/2266/Reports/JBAB/Draft
CONTACT: Lori Beth
CHARGE TIME TO: 2266-02
DUE: 1/8/21
REPORT PREPARED BY: Lori Beth
QA/ QC REVIEW BY: TBD
DELIVERED: 01/ xx /2020
> METHOD: Electronic
Notes:
1. Electronic only.
2.
3.
4.
2214 - RRL December Inspection Report
- Description:
- TITLE: RRL Inspection Report - December
CONTACT: Zach
CHARGE TIME TO: 2214.01
DUE: xx / xx / 20
REPORT PREPARED BY: Chinonye / Zach
QA/ QC REVIEW BY: TBD
DELIVERED: xx / xx / 2020
METHOD: Electronic
Notes:
1.
2.
3.
4.
|
8:00am |
|
8:10am |
|
8:20am |
|
8:30am |
|
8:40am |
|
8:50am |
|
9:00am |
|
9:10am |
|
9:20am |
|
9:30am |
|
9:40am |
|
9:50am |
|
10:00am |
|
10:10am |
|
10:20am |
|
10:30am |
|
10:40am |
|
10:50am |
|
11:00am |
|
11:10am |
|
11:20am |
|
11:30am |
|
11:40am |
|
11:50am |
|
12:00pm |
|
12:10pm |
|
12:20pm |
|
12:30pm |
|
12:40pm |
|
12:50pm |
|
1:00pm |
|
1:10pm |
|
1:20pm |
|
1:30pm |
|
1:40pm |
|
1:50pm |
|
2:00pm |
|
2:10pm |
|
2:20pm |
|
2:30pm |
|
2:40pm |
|
2:50pm |
|
3:00pm |
|
3:10pm |
|
3:20pm |
|
3:30pm |
|
3:40pm |
|
3:50pm |
|
4:00pm |
|
4:10pm |
|
4:20pm |
|
4:30pm |
|
4:40pm |
|
4:50pm |
|
5:00pm |
|