| |
5382/RVE/Park Manor Blvd (Brian & GPI)
- Description:
- ITEM: 5382/RVE/Park Manor Blvd (Brian & GPI)
CHARGE TIME TO: 5382.01 or 5382.02 - A Category
ADMIN SUPPORT:
LOCATION: Robinson
Notes:
1.
2384 - Camp Lejeune Draft GCM AMR
- Description:
- FILE PATH: Davenport Engineering/2384/Reports/R10
CONTACT (PM): Mike
CHARGE TIME TO: 2384.02E
SERVICE ITEM: A-LS
DUE:
REPORT PREPARED BY: Catlin
QA/QC REVIEW BY: Mike, Megan
DELIVERED: 11/15/2023
METHOD: DOD Safe
Notes:
1.
2.
3.
4.
2338 - Pymatuning BMP Inspection Report
- Description:
- FILE PATH: "T:\Clients\KCI\2338 - Pymatuning Campground Facilities\Field Work\BMP Soil Sampling\BMP Soil Sampling Inspection Report.pdf"
CONTACT (PM): MGJ
CHARGE TIME TO: 2338-05
SERVICE ITEM: B-T&M
DUE: 11 / 15/ 2023
REPORT PREPARED BY: LJS
QA/QC REVIEW BY: MGJ/MES
DELIVERED: 11/ 15/ 2023
METHOD: Email
Notes:
1.
2.
3.
4.
|
| 8:00am |
|
| 8:10am |
|
| 8:20am |
|
| 8:30am |
|
| 8:40am |
|
| 8:50am |
|
| 9:00am |
|
| 9:10am |
|
| 9:20am |
|
| 9:30am |
|
| 9:40am |
|
| 9:50am |
|
| 10:00am |
|
| 10:10am |
|
| 10:20am |
|
| 10:30am |
|
| 10:40am |
|
| 10:50am |
|
| 11:00am |
|
| 11:10am |
|
| 11:20am |
|
| 11:30am |
|
| 11:40am |
|
| 11:50am |
|
| 12:00pm |
|
| 12:10pm |
|
| 12:20pm |
|
| 12:30pm |
|
| 12:40pm |
|
| 12:50pm |
|
| 1:00pm |
|
| 1:10pm |
|
| 1:20pm |
|
| 1:30pm |
|
| 1:40pm |
|
| 1:50pm |
|
| 2:00pm |
|
| 2:10pm |
|
| 2:20pm |
|
| 2:30pm |
|
| 2:40pm |
|
| 2:50pm |
|
| 3:00pm |
|
| 3:10pm |
|
| 3:20pm |
|
| 3:30pm |
|
| 3:40pm |
|
| 3:50pm |
|
| 4:00pm |
|
| 4:10pm |
|
| 4:20pm |
|
| 4:30pm |
|
| 4:40pm |
|
| 4:50pm |
|
| 5:00pm |
|